Plan to Real Capacity, Not Nameplate: Turning OEE Into a Schedulable Run-Rate
Schedulers build the master plan against a line's nameplate rate, then watch it slip. OEE is the translation layer between theoretical speed and the number you can actually schedule against. Here is the arithmetic and the levers.